- 3 beds
- 3 baths
- 2,637 sq ft
5862 Champion Ln, Ave Maria, FL, 34142
Community: Del Webb Naples
-
Home type
Single family
-
Year built
2019
-
Lot size
10,019 sq ft
-
Price per sq ft
$295
-
Taxes
$9098 / Yr
-
HOA fees
$203 / Qtr
-
Last updated
3 days ago
-
Views
4
-
Saves
4
Questions? Call us: (239) 977-5722
Overview
This RARE INFINITY floor plan is located in the 55+ Del Webb community. This SALTWATER POOL HOME showcases over $180,000 in upgrades and options, offering a seamless blend of luxury finishes, smart technology, and thoughtful design. With 3 bedrooms plus a den and 3 full baths, this home was designed for both everyday comfort and effortless entertaining. The upgraded GOURMET KITCHEN serves as the heart of the home, featuring 42” upgraded cabinetry with soft-close pull-out drawers, a high-end cooktop, beverage cooler, wine and glass rack, and designer lighting. Soaring 11’ RAISED COFFERED CEILING and 21x21 diagonal tile flooring throughout the main living areas, den, and PRIMARY SUITE create a spacious and refined atmosphere. The PRIMARY SUITE offers a true retreat, complete with a tray ceiling, large walk-in closet, and a spa-inspired bath featuring a walk-in shower, soaking tub, and dual vanities. Step outside to your PRIVATE LANAI, where the HEATED SALTWATER POOL creates the perfect setting for relaxation or entertaining. This home is further enhanced by a comprehensive SMART HOME PACKAGE including a wireless access point, voice control, smart garage opener, smart door lock, and smart thermostat. IMPACT WINDOWS AND DOORS provide excellent storm protection, and a Storm Smart HURRICANE SCREEN adds additional convenience and peace of mind. ADDITIONAL UPGRADES include a built-in CALIFORNIA CLOSET office system in the den, CROWN MOLDING throughout, a front screened entry, WHOLE HOUSE WATER PURIFICATION SYSTEM, security system, upgraded front-load washer and dryer, window treatments, and an exterior light package with keyless entry. The 3-CAR GARAGE features a 4’ EXTENSION, EPOXY FLOORING and the GOLF CART IS INCLUDED. Furniture is negotiable, and a QUICK MOVE-IN is available. Meticulously maintained and better than new, this luxury Infinity floor plan offers the SOCIAL MEMBERSHIP, but take note GOLF LOVERS, Panther Run Golf Club offers optional MEMBERSHIPS with premium golf experiences just steps from your backyard. In Del Webb Naples, you’ll enjoy WORLD-CLASS AMENITIES that rival luxury resorts: dine at the Rusty Putter Restaurant, soak in the RESORT-STYLE or LAP POOLS, break a sweat in the state-of-the-art FITNESS CENTER, and play your way through PICKLEBALL, TENNIS, bocce, billiards - even a top-tier GOLF SIMULATOR! Need groceries, church, or a bite to eat? Just hop in your golf cart and cruise into town - Publix and the heart of Ave Maria are just minutes away. This isn’t just a home - it’s a LIFESTYLE UPGRADE in one of Southwest Florida’s most vibrant 55+ communities. Don’t miss your chance to live where fun, fitness, and friendships flourish year-round!
Interior
Appliances
- Dishwasher, Electric Cooktop, Freezer, Disposal, Microwave, Range, Refrigerator, Water Purifier, Washer
Bedrooms
- Bedrooms: 3
Bathrooms
- Total bathrooms: 3
- Full baths: 3
Laundry
- Inside
- Laundry Tub
Cooling
- Central Air, Ceiling Fan(s), Electric
Heating
- Central, Electric
Features
- Bedroom on Main Level, Bathtub, Tray Ceiling(s), Dual Sinks, Family/Dining Room, French Door(s)/Atrium Door(s), Kitchen Island, Living/Dining Room, Main Level Primary, Pantry, Separate Shower, Cable TV, Walk-In Pantry, Walk-In Closet(s), Window Treatments, Split Bedrooms
Size
- 2,637 sq ft
Exterior
Private Pool
- Yes
Patio & Porch
- Lanai, Patio, Porch, Screened
Roof
- Tile
Garage
- Attached
- Garage Spaces: 3
- Attached
- Driveway
- Garage
- Paved
- GarageDoorOpener
Carport
- None
Year Built
- 2019
Lot Size
- 0.23 acres
- 10,019 sq ft
Waterfront
- Yes
Water Source
- Public
Sewer
- Public Sewer
Community Info
HOA Information
- Association Fee: $203
- Association Fee Frequency: Quarterly
- Association Fee 2: $1,293
- Association Fee 2 Frequency: Quarterly
- Association Fee Includes: Basketball Court, Bocce Court, Billiard Room, Clubhouse, Sport Court, Dog Park, Fitness Center, Golf Course, Hobby Room, Library, Barbecue, Picnic Area, Playground, Pickleball, Park, Pool, Putting Green(s), Restaurant, Sauna, Spa/Hot Tub, Association Management, Cable TV, Golf, Internet, Irrigation Water, Legal/Accounting, Maintenance Grounds, Recreation Facilities, Reserve Fund, Water
Taxes
- Annual amount: $9,097.75
- Tax year: 2024
Senior Community
- Yes
Listing courtesy of: Sara Callahan, Realty One Group MVP Listing Agent Contact Information: SaraCallahanRE@gmail.com
MLS ID: 226007862
Copyright 2026 Southwest Florida MLS. All rights reserved. Information deemed reliable but not guaranteed. The data relating to real estate for sale on this website comes in part from the IDX Program of the Southwest Florida Association of Realtors. Real estate listings held by brokerage firms other than 55places.com are marked with the Broker Reciprocity logo and detailed information about them includes the name of the listing broker.
Del Webb Naples Real Estate Agent
Want to learn more about Del Webb Naples?
Here is the community real estate expert who can answer your questions, take you on a tour, and help you find the perfect home.
Get started today with your personalized 55+ search experience!
Want to learn more about Del Webb Naples?
Get in touch with a community real estate expert who can answer your questions, take you on a tour, and help you find the perfect home.
Get started today with your personalized 55+ search experience!
Homes Sold:
55+ Homes Sold:
Sold for this Community:
Avg. Response Time:
Community Key Facts
Age Restrictions
- 55+
Amenities & Lifestyle
- See Del Webb Naples amenities
- See Del Webb Naples clubs, activities, and classes
Homes in Community
- Total Homes: 2,123
- Home Types: Single-Family, Attached
Gated
- Yes
Construction
- Construction Dates: 2007 - Present
- Builder: Del Webb
Similar homes in this community
Popular cities in Florida
The following amenities are available to Del Webb Naples - Ave Maria, FL residents:
- Clubhouse/Amenity Center
- Golf Course
- Restaurant
- Fitness Center
- Outdoor Pool
- Aerobics & Dance Studio
- Card Room
- Arts & Crafts Studio
- Library
- Walking & Biking Trails
- Tennis Courts
- Pickleball Courts
- Bocce Ball Courts
- Softball/Baseball Field
- Basketball Court
- Volleyball Court
- Outdoor Amphitheater
- Gardening Plots
- Playground for Grandkids
- Continuing Education Center
- Soccer Fields
- Demonstration Kitchen
- Outdoor Patio
- Pet Park
- Steam Room/Sauna
- Golf Practice Facilities/Putting Green
- Picnic Area
- On-site Retail
- Multipurpose Room
- Misc.
- Locker Rooms
There are plenty of activities available in Del Webb Naples. Here is a sample of some of the clubs, activities and classes offered here.
- Aerobics
- Arts & Crafts
- Bicycling
- Billiards
- Bocce Ball
- Book Discussions
- Bowling
- Bridge
- Bunco
- Cooking
- Dancing
- Dinner Shows
- Fitness
- Golf
- Mah Jongg
- Movie Nights
- Pickleball
- Pottery
- Sunset Cruises
- Swimming
- Tennis
- Theater
- Travel
- Woodworking




